Project Description
Client: smart home technology to Sol Bright
Location: Sweihan , Abu Dhabi , United Arab Emirates
Contracting type: subcontractor.
Owner: Abu Dhabi National Energy Company (TAQA)
1177WM sub contractor for Robots maintenance Noor Abu Dhabi Solar System plant Sweihan , UAE
contractor – (Smart home technology & Sol bright) Jan 2020
Scope of work
Earthing Works for 1177MW including:
- Installing 25Sqmm Harness 300mm length
- Installing 25sqmm harness 1500mm length
- Structure to Structure earthing 1x 25sqmm flexible class PVC insulation
- Installing Earth pits with Earth rods and connecting to bare
- Installing 185sqmm PVC earthing for Inverter, RMU, LV Compartment,
- Installing 25sqmm PVC cable for SCB
- Installing 50sqmm & 50sqmm PVC cable for Structure Earthing
- Exothermic bonds
- Joining C1 120sqmm Bare Copper and 185sqmm PVC (T- Connection).
- Joining C2 120sqmm Bare Copper and 185sqmm PVC ( 4 – Way ).
- Joining C3 120sqmm Bare Copper and 50sqmm PVC (T- Connection).
- Joining C4 120sqmm Bare Copper and 120sqmm PVC (T- Connection).
- Total Invertor station Earthing